Ural Steel is the optimal combination of rich experience, new technologies, team of professionals and aspiration for leadership.

Investment projects

Ural Steel is the leader in production investments. Measures are aimed at upgrading equipment and improving working conditions, mastering new technologies and producing new types of products, improving safety and environmental friendliness of production.
  • 0

    bn 5-year
    investment program

  • 0

    bn 2024 Capital
    Expenditure Plan

  • 0

    bn re-equipment
    and reconstruction

  • 0

    bn targeted
    projects

  • 0

    bn development
    projects

key projects

  • Upgrading of 4 pelletizing drums in the Sinter Plant will allow to increase sinter production due to higher gas permeability of sintering mix and increase of sintering mix layer on sinter machines.


    technical characteristics:

    capacity - up to 350 tons/hour,

    drum diameter - 2.8 m, length - 8 m,


    date of putting into operation:

    Q3 2024.

  • Extension of Steelmaking Plant building in bays “A-B-C-D-E-F” with placement of hot metal supermarket (mixer department) for temporary storage, maintenance of temperature up to 1 400 degrees C and averaging of the chemical composition of hot metal


    technical specifications:

    useful capacity - 1,300 tons,
    inclination angle is 45 degrees


    project completion:

    Q4 2024 - extension of Steelmaking Plant.

  • Installation of the Double Side Trimming Shears in Plate Rolling Mill -1 for simultaneous cutting of side edges of rolled plates with thickness of 7-50 mm with tensile strength up to 1300 MPa in automatic mode.


    technical specifications:

    edge trimming speed: 14-19 m/min., trimming width: 14-150 mm., blade life: 6480 tons.


    date of putting into operation:

    Q1 2025.

  • Construction of 2-position Vacuum Degasser (VD) in Steelmaking Plant to improve the quality of liquid steel by reducing the content of hydrogen, oxygen and non-metallic inclusions in it.


    technical specifications:

    VD capacity - 1.2 million tons of steel per year


    date of putting into operation:

    Q1 2025.

  • Construction of billet CCM-3 complex in Steelmaking Plant.


    technical specifications:

    design capacity - 1 million tons/year, square billets of 150x150 mm., rounds of 156, 200, 240, 300 mm diameter, length of billets: 4-12 meters.


    date of putting into operation:

    Q4 2025.

  • Construction of Wheel Rolling Complex for production of solid railway wheels


    technical specifications:

    design capacity of the Wheel Rolling Mill - 360 thousand pieces per year with the possibility of increasing up to 480 thousand pieces per year


    date of putting into operation:

    Q4 2025.